How to Get a Townhouse Approved in NSW: A Step-by-Step Guide

A townhouse is a multi-level, attached or semi-detached residential dwelling, often part of a larger development. Getting a townhouse approved in NSW involves thorough planning, including compliance with zoning, design and council requirements, supported by expert guidance.


Navigating the process of getting a townhouse development approved in New South Wales (NSW) can feel overwhelming, but with the right knowledge and approach, it’s achievable.


Whether you’re a first-time developer or an experienced builder, understanding the intricacies of the approval process is crucial to successfully bringing your project to life.



modern townhouses in NSW


1. Preliminary Research: Setting the Foundation


Before diving into the planning process, it’s essential to conduct thorough research to determine whether your property is suitable for townhouse development.


  • Zoning and Planning Regulations: Begin by reviewing the Local Environmental Plan (LEP) and Development Control Plan (DCP) for your area. These documents outline what’s permissible on your site, including zoning, minimum lot sizes, and frontage requirements.

  • Site Suitability: Ensure your property meets all the required conditions, including access, topography, and any environmental constraints such as bushfire risk or flooding.

  • State and Local Policies: Familiarise yourself with any updated state planning policies, such as design requirements for multi-dwelling housing, to avoid setbacks later in the process.


2. Preparing Documentation: The Building Blocks


Once you’ve confirmed your site’s suitability, the next step is to prepare comprehensive documentation for your Development Application (DA).


  • Key Plans and Reports: These include site plans, floor plans, and elevations, as well as technical reports such as drainage assessments, traffic impact studies, and stormwater management plans.

  • Sustainability Compliance: Complete a BASIX (Building Sustainability Index) assessment to demonstrate your development meets NSW energy and water efficiency standards.

  • Development Cost Estimate: Provide a detailed cost breakdown for your project, which will influence council fees and the scale of required contributions.


3. Submitting Your Development Application (DA)


Once your documentation is ready, it’s time to lodge your DA with the local council.


  • DA Forms and Fees: Complete all necessary forms and pay the required fees, which are typically calculated based on your estimated development cost.

  • Community Notification: For townhouse developments, councils often notify nearby residents and invite public comments. Addressing potential objections early can help mitigate delays.

  • Assessment Process: An assessment officer will review your application against the relevant planning policies and may request additional information or modifications to your plans.





4. Navigating Design Considerations


Design plays a pivotal role in townhouse approvals, and getting it right from the start is critical.


  • State and Local Compliance: Recent updates to state policies have introduced stricter guidelines for design quality, including open space, privacy, and landscaping. Engage an architect familiar with these requirements to avoid redesigns.

  • Striking the Balance: While developers often aim for maximum returns, councils and residents prioritise preserving streetscape character. Collaborating with a town planner can help balance density with aesthetic appeal, increasing the likelihood of approval.


5. The Approval Decision and Beyond


Council will typically determine your application within 40–90 days. If approved, you’ll receive a development consent outlining conditions that must be met.


  • Post-Approval Steps: Obtain a Construction Certificate (CC) before starting work, ensuring your plans align with the approved DA.

  • Compliance Monitoring: Adhere to all conditions, including stormwater management, landscaping, and parking requirements, to avoid penalties.


6. The Role of Parking in Townhouse Approvals


Parking can often make or break a townhouse development proposal.


  • Council Requirements: Most councils have specific parking minimums for multi-dwelling housing. For example, you may need to provide one parking space per unit and additional visitor parking.

  • Alternative Contributions: If meeting on-site parking requirements isn’t feasible, councils may allow developers to contribute towards public infrastructure improvements as an alternative. Consulting with a town planner can help you negotiate these solutions effectively.


7. Appeal Rights: What If Your DA Is Refused?


If your application is denied, all hope is not lost.


  • Understanding the Process: You have the right to appeal the council’s decision through the NSW Land and Environment Court. This process involves presenting evidence that your proposal meets planning guidelines.

  • Seeking Expert Help: Engaging a town planner or legal expert is essential to prepare and lodge the necessary documents and advocate for your case effectively.


8. Key Considerations for Townhouse Development


  • Community Engagement: Addressing potential concerns from neighbours early can help reduce objections and ensure smoother approvals.

  • Professional Guidance: A town planner can guide you through every step of the process, from initial feasibility studies to post-approval compliance.

  • Budgeting for Contributions: Factor in costs such as developer contributions for infrastructure upgrades and public amenities.